MAIN MENU
    Shop Online
    Show Cart
    Home
    Garden Rooms
    Datasheets
    Help Guides
    News
    Contact Us

Join Our Newsletter
Email:



OM110

Om110 Snap Fix Rafter bar fitting guide

Measure and cut the aluminium bar and PVC capping to length. Place the aluminium bars onto the timber rafters and drill pilot holes into the glazing rebate (not the centre channel) approximately every 750mm starting 50mm from the eaves end. Screw fix the aluminium bars onto the timber rafters )screws not in the pack).

Measure the glazing size between the rebate up-stands and deduct 4mm for expansion. Cut the sheets to length and width,try to cut near a vertical wall to avoid a "floppy" edge. Fit the sheets into position and line up the pvc capping into the aperture of the aluminium bar. Using a mallet,tap the cap into the correct positions to clamp the sheets tightly.

Finally fix the end plate onto the end of the bar by screwing it into the pvc screw port with the screw/cap provided.

Omega (Roofing) Plastics Ltd, West Ley, Alswear Old Road, South Molton, Devon EX36 4LE, England
If you have any queries please contact us on Tel No. 01769 574426 Fax No. 01769 574459
Email info@omegabuild.com | Web Design | Website Optimization